From survey to operation, with no hand-offs
One contract, one project manager. Average time from signature to energisation: 7–11 months, permitting included.
- Phase 01
Survey and feasibility
Topographic survey of the car park, quarter-hourly consumption analysis, planning constraints check and PVGIS yield estimate.
- Phase 02
Integrated design
Structural, electrical and architectural design coordinated in BIM, with signed calculation report and detailed bill of quantities.
- Phase 03
Permits and grid connection
PAS/AU permitting, grid connection request with the DSO, GSE, customs and fire-safety filings.
- Phase 04
Construction
Foundations, steelwork assembly, module installation and cabling, functional testing and energisation, with the site kept operational.
- Phase 05
Operation and maintenance
Remote monitoring, scheduled maintenance, performance guarantee and charging flow management.